Missouri Transit Corridors Improvements
Approximately $1.42 million in TIGER funds will be used for Missouri corridors transit improvements (North Oak Trafficway and U.S. 24 and U.S. 40 corridors in eastern Jackson County). The project consists of improving bus stops and increasing pedestrian access to and from these bus stops.
The bus-stop improvements generally consist of a concrete pad in the street, where warranted, and a concrete pad at the back of the curb that forms the passenger waiting area and provides for passenger amenities. The amenities — shelters, signs, benches, etc. — will vary depending on the needs at each location.
Pedestrian connection improvements will also be made to provide better access to bus stops in certain corridors. These will consist of new sidewalks and, where necessary, ADA curb-ramp installations. The specific locations for each of these transit stop and pedestrian improvements as well as the detailed list of amenities at each location are in the draft scope documents.
General Work Schedule
Eastern Corridors (Independence, Mo.) |
|
| Bid Release Dates | |
| Planning, design and installation of heaters and landscaping at Independence transit center | Winter 2011 |
| Planning, design and construction of bus-stop improvements at Truman & Winner Road, Truman & Osage | Fall 2011 |
| Design and construction of transit improvements at U.S. Highway 24 & Brookside | Fall 2011 |
Eastern Corridors (Kansas City, Mo.) |
|
| Bid Release Dates | |
| Design and construction of transit improvements at Independence Avenue & Garfield, Monroe, Hardesty, Beacon (westbound); 31st & Prospect; 31st & Indiana | Fall 2011 |
| Planning, design and construction of Blue Ridge transit center | Winter 2012 |
Boulevard Stop Improvements |
|
| Bid Release Dates | |
| Design and construction of bus-stop improvements on Linwood and Prospect | Winter 2012 |
North Oak Corridor (North Kansas City; Kansas City, Mo.; Gladstone) |
|
| Bid Release Dates | |
| NORTH KANSAS CITY: Design and construction of bus-stop improvements on Burlington at 10th Street, Armour Road, 26th Street | Winter 2012 |
| KCMO: Design and construction of bus-stop improvements at North Oak and 42nd Street, Vivion Road, 5036 North Oak, 52nd Terrace (Salvation Army), Englewood, 79th Street, Barry Road | Winter 2012 |