All documents
are in PDF format, requiring Adobe
Reader. If you have a high-speed Internet connection, you may
wish to download the entire document.
For those with slower connections, individual sections are linked
below.
Feasibility Study (June 2000)
Mission
Statement
"Operation
Green Light exists to significantly reduce air pollution, stops,
delays, driver frustration, and fuel consumption in the Kansas
City area by optimizing the travel times, safety and traffic flow
along arterial corridors..." Full
Document>
Operation
Green Light Committees
Agendas
and summaries for the Operation Green Light Steering and Technical
Committees are available for download.
Concept
of Operations: Roles and Responsibilities
This
document outlines the roles and responsibilities
of member agencies, OGL staff and others.
Functional
Specifications for System Integrator
This
document functionally specifies central system software and enumerates the tasks and deliverables to be produced by the System
Integrator for the new Advanced Traffic Management System (ATMS)
for the Operation Green Light (OGL) project administered by MARC.
|