Timeline
The South Metro Connection Study was launched in early 2006. The project is expected to produce initial recommendations for the study area within 12 to 16 months. More time will be needed to do the environmental assessment. A schedule is being developed, and data collection efforts are underway in jurisdictions that are part of the study.
| Stage 1: | Stage 2: | Stage 3: |
Stage 4: | Stage 5: |
Data Collection
|
Purpose
|
Concept
|
Refine/
|
Environmental Documentation |
[See more detailed timeline presented at open house meeting]
NOTE: Extensive public involvement is planned throughout the study