![]() |
|
|
|
MARC Home > Transportation Department > Plans & Studies > Studies > U.S. 24/40 Corridor Study U.S. 24/40 Corridor StudyCompleted in 2008The U.S. 24/40 Corridor Study developed a 30-year corridor master plan for current and future land use and transportation integration along an initial two-mile-wide corridor in Leavenworth County, KS, beginning at the interchange of K-7 and U.S. 24/40, continuing west through Basehor and Tonganoxie, and terminating one mile south of Tonganoxie at the junction of County Road 1 and U.S. 24/40. Study Documents
The preparation of this report was financed in part with funding from United States Department of Transportation (USDOT), administered by the Kansas Department of Transportation (KDOT) and the Missouri Department of Transportation (MoDOT). The opinions, findings and conclusions expressed in this publication are those of the authors and not necessarily those of USDOT, KDOT and MoDOT.
|
|
600 Broadway, Suite 200 |
MARC's
Role Committees
Plans
& Studies
Project Funding |
|
| MARC
programs that receive federal funding may not discriminate against anyone on the basis of race, color or national origin, according to Title VI of the Civil Rights Act of 1964. Title VI Policy | Limited English Proficiency Plan | Americans with Disabilities Act Resources |
||